Home | Sitemap    
CONTRACT YEAR CLIENT ENGINEER / CONSULTANT VALUE STATUS  PROJECT MANHOUR
REPLACEMENT OF 11 KV CABLES FOR GTAU 1-2-5 AT ASAB 1992 ADCO ADCO $546,825 COMPLETE 14,700
   
SCADA PROJECT ASAB         1992 ADCO $115,000 COMPLETE 5,300
   
H.H.RUWAIS VILLA MODIFICATIONS AND EXTENSIONS  1992 H.H.SHIEKH KHALIFA PRIVATE DEPT. A.E.C                 ABU DHABI $900,000 COMPLETE 96,000
   
REPLACEMENT OF 11 KV CABLES 1992 ADCO ADCO $130,760 COMPLETE 3,700
   
H.H. AL AIN COMPLEX NEW ANCILLARY BUILDINGS  1992 H.H. PRIVATE   MANAGEMENT A.E.C             ABU DHABI $230,000 COMPLETE 13,000
   
FIRE PROOFING OF ACTUATORS IN ALL AREAS  1992 ADCO ADCO $1,417,000 COMPLETE 33,760
   
REPLACEMENT OF MOV ACTUATORS AT JEBEL DHANNA 1992 ADCO ADCO $202,000 COMPLETE 6,600
   
AUTO FIRE  PROTECTION IDN SYSTEM DAS ISLAND 1991 ADGAS ADGAS $54,000.00 COMPLETE 4,300
   
H.H.UM GHAFA VILLA EXTENSION  1991 H.H. PRIVATE   MANAGEMENT A.E.C               ABU DHABI $250,000 COMPLETE 14,000
   
INSTALLATION OF FLOW ANALYSERS ON THE ASAB WATER INJECTION SYSTEM 1991 ADCO ADCO $435,000 COMPLETE 11,700
   
UPGRADING OF DRINKING WATER SYSTEM 1990 ADNOC ADNOC $25,000 COMPLETE 3,700
   
AVIATION FUEL DEPOT AT AL AIN AIRPORT 1990 ADNOC FOD KHATIB AL ALAMI $1,500,000 COMPLETE 129,000
   
AL KHAZNA AREA DRAINAGE. MI9 C/D                             1990 AL AIN MUNICIPALITY D BALFOUR & SONS $1,040,000 COMPLETE 46,000
   
SAFETY HAND REAILS AT UMM AL NAR REFINERY 1990 ADNOC ADNOC $35,000 COMPLETE 2,600
   
MAINTENANCE OF FILLING STATIONS 1989 ADNOC FOD ADNOC FOD $100,000 COMPLETE 3,200
   
SEWAGE PUMP STATION  1989 ABU DHABI MUNICIPALITY JOHN TAYLOR & SONS $231,000 COMPLETE 17,000
   
ASAB 33 KV OVERHEAD LINES 1989 ADCO ADCO $271,000 COMPLETE 22,000
   
SOLAR POWER SYSTEM FOR THAMMAMA “C“ REMEDIAL PROJECT 1989 ADCO ADCO $1,062,000 COMPLETE 37,600
   
G.H.Q. AREA LABORATORY 1988 ADDF ENGINEERING CORPORATION $250,000 COMPLETE 13,600
             
REPLACEMENT OF CABLES TRAYS AT UMM AL NAR REFINERY  1988 ADNOC ADNOC $200,000 COMPLETE 25,500
   
RENOVATION OF PLANT AT ABU DHABI POWER STATION 1988 WED TEBODIN $650,000 COMPLETE 31400
   
ALAIN MAJLIS  1988 DIWAN OF H.H. SHEIK   KHALIFA A.E.C ABU DHABI $330,000 COMPLETE 21,700
   
REINSTATEMENT OF ELECTRICAL SYSTEMS AT THE MERIDIEN HOTEL  1988 ABU DHABI NATIONAL HOTELS COMPANY HYSSENA INTERNATIONAL $150,000 COMPLETE 15,500
   
SUPPLY AND ERECT 33 KV BYPASS CABLE AT RUWAIS 1988 ADNOC ADNOC $168,000 COMPLETE 4,300
   
CONNECTION OF POWER SUPPLY TO TV STATION AT HABSHAN 1987 ADCO ADCO $80,000 COMPLETE 2,100
   
REFURBISHMENT OF ADCO  11 KV SWITCHGEAR 1987 ADCO ADCO $100,000 COMPLETE 7,200
   
33 KV OVERHEAD BETWEEN THAMMAMA “C“ ADCO AND GASCO 1987 ADCO ADCO $462,000 COMPLETE 33,700
   
11 KV OVERHEAD LINE INTERCONNECTION THAMMAMA “C” BAB 1986 ADCO ADCO $30,000 COMPLETE 2,880
   
EC-731 WATER SUPPLY TO BIDA HAZA & AL HAMRA CAMPS 1986 ADDF ENGINEERING CORPORATION $1,603,000 COMPLETE 53,000
   
BU HASA WATER INJECTION PROJECT  ELECTRICAL WORKS 1986 ADCO ADCO $100,000 COMPLETE 17,000
   
EC-714 AL DHAFRA AIR BASE ELECTRICAL WORKS 1986 ADDF ENGINEERING CORPORATION $1,525,000 COMPLETE 47,000
   
BU HASA WATER INJECTION REFURBISHMENT OF 33KV POWER SKIDS 1986 ADCO ADCO $30,000 COMPLETE 7,000
   
REPAIRS TO PRODUCT STORAGE TANK AT UMM AL NAR 1986 ADNOC ADNOC $100,000 COMPLETE 4,700
   
MODIFICATION TO EQUIPMENT IN PROPOSED ZONE 11 AREA DAS ISLAND 1985 ADMA-OPCO ADMA-OPCO $420,000 COMPLETE 77,500
   
ASAB OIL GATHERING SYSTEM 1985 ADCO ADCO $75,000 COMPLETE 3,120
   
INSTALLATION OF METERING SKIDS  1985 ADNOC TEBODIN $150,000 COMPLETE 2,370
   
MODIFICATION AND EXTENSIONS TO THE ABU DHABI POWER STATION 1984/5 WED TEBODIN $5,500,000 COMPLETE 127,900
             
RUWAIS HYDROCRAKING PROJECT PLANT EARTHING 1983 ADNOC SNAMPROGETTI SPA $180,000 COMPLETE 4,600
   
RUWAIS HYDRO CRACKING PROJECT STRUCTURAL STEEL ERECTION 1983 ADNOC SNAMPROGETTI SPA $750,000 COMPLETE 10,080
   
RUWAIS HYDROCRACKING CATHODIC PROTECTION 1983 ADNOC SNAMPROGETTI SPA $471,000 COMPLETE 63,360
   
RUWAIS HYDRO CRACKING PROJECT PIPE FABRICATION AND INSTALLATION 1983 ADNOC SNAMPROGETTI SPA $1,500,000 COMPLETE 63,700
   
PENTANE PLUS PIPELINE PROJECT 1983 ADNOC ADNOC $1,500,000 COMPLETE 47,800
   
THAMMAMA “C” GAS PROJECT UNDER GROUND PIPING 1982 ADNOC FLOUR MIDDLE EAST $1,500,000 COMPLETE 37,440
   
THAMMAMA “C” GAS MAIN PIPE RACK AND MAIN PIPE RACK AND
PORTAL FRAME BUILDING
ERECTION
1982 ADNOC FLOUR MIDDLE EAST $720,000 COMPLETE 18,480
   
THAMMAMA “C” GAS PROJECT TEMPORARY POWER 1982 ADNOC FLOUR MIDDLE EAST $4,500,000 COMPLETE 146,000
   
STRUCTURAL STEEL FOR CENTRAL BEVERAGE STORE 1982 ADMA-OPCO ADMA-OPCO $200,000 COMPLETE 3,850
   
11 KV DISTRIBUTION SYSTEM 1982 ADNOC M.W. KELLOGG  $220,000 COMPLETE 25,500
     
FIRE ALARM AND EMERGENCY TELEPHONE SYSTEM 1981 ADNOC M.W. KELLOGG  $160,000 COMPLETE 3,600
   
LNG/LPG STORAGE 1981 ADNOC ENGINEERS INDIA LTD $200,000 COMPLETE 79,000
   
AL AIN FUEL DEPOT 1981 ADNOC ENGINEERS INDIA LTD $3,700,000 COMPLETE 86,640
   
WATER SUPPLY SYSTEM OLD SWEIHAN CAMP 1981 ADDF ENGINEERING CORPORATION $1,200,000 COMPLETE 25,920
   
EXTERNAL WORKS FOR STATE MAJLIS  1981 H.H.SHIEKH KHALIFA PRIVATE DEPT. DAR AL AMARA $4,500,000 COMPLETE 78,000
   
ZADCO TRAINING CENTRE  1980 ZAKUM DEVELOPMENT COMPANY ZADCO PROJECTS DEPARTMENT $264,000 COMPLETE 31,680
     
Copyright © All Rights Reserved.