CONTRACT YEAR CLIENT ENGINEER / CONSULTANT VALUE STATUS  PROJECT MANHOUR
   
PERMANENT DEWATERING SYSTEM AT RUWAIS HOUSING COMPLEX. 1995 ADNOC ACER JOHN TAYLOR $700,000 COMPLETE 45,000
   
RUWAIS FRACTIONATION PLANT DEBOTTLENECKING 1995 GASCO M.W. KELLOGG $10,629,000 COMPLETE 950,000
   
MAJLIS FOR H.H. SH. SULTAN BIN ZAYED AL NAHYAN 1995 PWD  GHAZI AWAD $91,000 COMPLETE 6,000
   
CONTRACT 414A. KHALIFA TOWN A SEWAGE WORKS   1995 SPC DORSCH CONSULT $70,986 COMPLETE 5,500
   
CONSTRUCTION OF BASE OIL STORAGE TANKS & PIPING AT LUBE OIL PLANT UM AL NAR 1995 ADNOC FOD ADNOC FOD $800,000 COMPLETE 75,900
   
INSTALLATION OF DYPHIL LINE AT CHLORINE PLANT 1995 ADNOC ADNOC $60,000 COMPLETE 4,300
   
SUPPLY AND INSTALL GENERATORS & PUMPS  1994 ABU DHABI MINICIPALITY MUNICIPALITY $1,510,000 COMPLETE 24,000
   
RELOCATION OF HIGH PRESSURE SEAL OIL PUMPS 1994 ADNOC ADNOC $ 75, 000 COMPLETE 6,250
   
INSTALLATION OF WELLHEAD PANELS 1994 ADCO ADCO  $1,700,000 COMPLETE 76,400
   
SUPPLY AND INSTALL  OVERHEAD LINES AND EQUIPMENT     1994 WED WED $3,490,000 COMPLETE 127,300
   
ZUBBAYA/RUMITHA EARLY PRODUCTIONS GAS STATIONS  1994 ADCO BAKERMO $200,000 COMPLETE 21,000
   
HAZOP PACKAGE “B“ IMPLEMENTATION     1993/4 ADCO ADCO $3,200,000 COMPLETE 145,000
   
BAB OIL DEVELOPMENT 1993 ADCO ADCO $10,800 COMPLETE 1,200
   
PORT ZAYED COLD STORES                                            1993 PORT ZAYED SEA PORT AUTHORITY T.S.S.C ABU DHABI $76,500 COMPLETE 3,250
   
INSTALLATION OF AIR COMPRESSOR FOR CHLORINE INDUSTRIES    1993 ADNOC ADNOC $21,600 COMPLETE 1,250
   
REVERSE OSMOSIS  UNITS AND HT POWER SUPPLY AT HABSHAN 1993 ADCO ADCO  $4,400,000 COMPLETE 115,000
   
DRAIN RELIEF AND BURN PIT AT HABSHAN AND SHAMES 1992 ADCO ADCO $868,000 COMPLETE 7,400
   
JARN YAPHOUR DEVELOPMENT 1992 ADNOC SNAMPROGETTI SPA $360,000 COMPLETE 26,300
   
M 23A ALAIN MAIN DRAINAGE           1992 AL AIN MUNICIPALITY D BALFOUR & SONS $210,000 COMPLETE 18,600
REPLACEMENT OF 11KV CABLES FOR GTAU 1-2-5 AT ASAB 1992 ADCO ADCO $546.825 COMPLETE 14,700
   
SULPHER CONTROL AND DEHYDRATION PROJECT AT ASAB 1992 ADCO ADCO $115,000 COMPLETE 15,300
   
H.H.RUWAIS VILLA MODIFICATIONS AND EXTENSIONS 1992 H.H.SHIEKH KHALIFA PRIVATE DEPT A.E.C ABUDHABI $3,300,000 COMPLETE 46,000
   
REPLACEMENT OF 11KV CABLES GTAU 3-4 1992 ADCO ADCO $130,000 COMPLETE 3,700
   
H.H. AL AIN COMPLEX NEW ANCILLARY BUILDINGS 1992 H.H.PRIVATE MANAGEMENT A.E.C. ABU DHABI $230,000 COMPLETE 13,000
   
FIRE PROOFING OF ACTUATORS IN ALL AREAS 1992 ADCO ADCO $1,417,000 COMPLETE 33,760
   
REPLACEMENT OF MOV ACTUATORS AT JEBEL DHANNA 1992 ADCO ADCO $202,000 COMPLETE 6,600
   
AUTO FIRE PROTECTION IDN SYSTEM DAS ISLAND 1991 ADGAS ADGAS $54,000.00 COMPLETE 4,300
   
H.H.UM GHAFA VILLA EXTENSION 1991 H.H.PRIVATE MANAGEMENT A.E.C ABU DHABI $250,000 COMPLETE 14,000
   
INSTALLATION OF FLOW ANALYSERS ON THE ASAB WATER INJECTION SYSTEM 1991 ADCO ADCO $435,000 COMPLETE 11,700
   
UPGRADING OF DRINKING WATER SYSTEM 1990 ADNOC ADNOC $25,000 COMPLETE 3,700
   
AVIATION FUEL DEPOT AT AL AIN AIRPORT 1990 ADNOC FOD KHATIB AL ALAMI $1,500,000 COMPLETE 129,000
   
AL KHAZNA AREA DRAINAGE. M19 C/D 1990 ADNOC ADNOC $35,000 COMPLETE 67,000
   
SAFETY HAND REAILS AT AUMM AL NAR REFINERY 1990 ADNOC ADNOC $35,000 COMPLETE 2,600
   
MAINTENANCE OF FILLING STATIONS 1989 ADNOC FOD ADNOC FOD $100,000 COMPLETE 3,200
   
SEWAGE PUMP STATION 1989 ABU DHABI MUNICIPALITY JOHN TAYLOR & SONS $231,000 COMPLETE 17,000
   
ASAB 33KV OVERHEAD LINES 1989 ADCO ADCO $271,000 COMPLETE 22,000
   
SOLAR POWER SYSTEM FOR THAMMAMA 'C' REMEDIAL PROJECT 1989 ADCO ADCO $1,062,000 COMPLETE 37,600
   
G.H.Q. AREA LABORATORY 1988 ADDF ENGINEERING CORPORATION $250,000 COMPLETE 13,600
   
REPLACEMENT OF CABLES TRAYS AT UMM AL NAR REFINERY 1988 ADNOC ADNOC $200,000 COMPLETE 25,500
   
RENOVATION OF PLANT AT ABU DHABI POWER STATION 1988 WED TEBODIN $650,000 COMPLETE 31,400
   
AL AIN MAJLIS 1988 DIWAN OF H.H. SHEIKH KHALIFA A.E.C ABU DHABI $330,000 COMPLETE 21,700
   
REINSTATMENT OF ELECTRICAL SYSTEMS AT THE MERIDIEN HOTEL 1988 ABU DHABI NATIONAL HOTELS COMPANY HYSSENA INTERNATIONAL $150,000 COMPLETE 15,500
   
SUPPLY AND ERECT 33KV BYPASS CABLE AT RUWAIS 1988 ADNOC ADNOC $168,000 COMPLETE 4,300
   
CONNECTION OF POWER SUPPLY TO TV STATION AT HABSHAN 1987 ADCO ADCO $80,000 COMPLETE 2,100
   
REFURBISHMENT OF ADCO 11KV SWITCHGEAR 1987 ADCO ADCO $462,000 COMPLETE 33,700
   
33 KV OVERHEAD BETWEEN THAMMAMA 'C' ADCO AND GASCO 1987 ADCO ADCO $462,000 COMPLETE 33,700
   
11 KV OVERHEAD LINE INTERCONNECTION THAMMAMA 'C' BAB 1986 ADCO ADCO $30,000 COMPLETE 2,880
   
EC-731 WATER SUPPLY TO BIDA HAZA & AL HAMRA CAMPS 1986 ADDF ELECTRICAL CORPORATION $1,603,000 COMPLETE 53,000
   
BU HASA WATER INJECTION PROJECT ELECTRICAL WORKS 1986 ADCO ADCO $100,000 COMPLETE 17,000
   
EC-714 AL DHAFRA AIR BASE ELECTRICAL WORKS 1986 ADCO ENGINEERING CORPORATION $1,525,000 COMPLETE 47,000
   
BU HASA WATER INJECTION REFURBISHMENT OF 33KV POWER SKIDS 1986 ADCO ADCO $30,000 COMPLETE 7,000
   
REPAIRS TO PRODUCT STORAGE TANK AT UMM AL NAR 1986 ADNOC ADNOC $100,000 COMPLETE 4,700
   
MODIFICATION TO EQUIPMENT IN PROPOSED ZONE 11 AREA DAS ISLAND 1985 ADMA-OPCO ADMA-OPCO $420,000 COMPLETE 77,500
   
ASAB OIL GATHERING SYSTEM 1985 ADCO ADCO $75,000 COMPLETE 3,120
   
INSTALLATION OF METERING SKIDS 1985 ADNOC TEBODIN $150,000 COMPLETE 2,370
   
MODIFICATION AND EXTENSIONS TO THE ABU DHABI POWER STATION 1984/5 WED TEBODIN $5,500,000 COMPLETE 127,900
   
RUWAIS HYDROCRAKING PROJECT PLANT EARTHING 1983 ADNOC SNAMPROGETTI SPA $174,000 COMPLETE 4,600
   
RUWAIS HYDRO CRACKING PROJECT STRUCTURAL STEEL ERECTION 1983 ADNOC SNAMPROGETTI SPA $750,000 COMPLETE 10,080
   
RUWAIS HYDROCRACKING CATHODIC PROTECTION 1983 ADNOC SNAMPROGETTI SPA $471,000 COMPLETE 27,000
   
RUWAIS HYDRO CRACKING PROJECT PIPE FABRICATION AND INSTALLATION 1983 ADNOC SNAMPROGETTI SPA $1,500,000 COMPLETE 63,700
   
PENTANE PLUS PIPELINE PROJECT 1983 ADNOC ADNOC $1,500,000 COMPLETE 47,800
   
THAMMAMA 'C' GAS PROJECT UNDER GROUND PIPING 1982 ADNOC FLOUR MIDDLE EAST $1,500,000 COMPLETE 37,440
   
THAMMAMA 'C' GAS MAIN PIPE RACK AND MAIN PIPE RACK AND PORTAL FRAME BUILDING ERECTION 1982 ADNOC FLOUR MIDDLE EAST $720,000 COMPLETE 18,480
   
THAMMAMA 'C' GAS PROJECT TEMPORARY POWER 1982 ADNOC FLOUR MIDDLE EAST $4,500,000 COMPLETE 146,000
   
STRUCTURAL STEEL FOR CENTRAL BEVERAGE STORE 1982 ADMA-OPCO ADMA-OPCO $200,000 COMPLETE 3,8500
   
11 KV DISTRIBUTION SYSTEM 1982 ADNOC M.W. KELLOGG $220,000 COMPLETE 25,500
   
FIRE ALARM AND EMERGENCY TELEPHONE SYSTEM 1981 ADNOC M.W. KELLOGG $160,000 COMPLETE 3,600
   
LNG/LPG STORAGE 1981 ADNOC ENGINEERS INDIA LTD $200,000 COMPLETE 79,000
   
AL AIN FUEL DEPOT 1981 ADNOC ENGINEERS INDIA LTD $3,700,000 COMPLETE 86,640
   
WATER SUPPLY SYSTEM OLD SWEIHAN CAMP 1981 ADDF ENGINEERING CORPORATION $1,200,000 COMPLETE 25,920
   
EXTERNAL WORKS FOR STATE MAJLIS 1981 H.H. SHIEKH KHALIFA PRIVATE DEPT. DAR AL AMARA $4,550,000 COMPLETE 78,000
   
ZADCO TRAINING CENTRE 1980 ZAKUM DEVELOPMENT COMPANY ZADCO PROJECTS DEPARTMENT $264,000 COMPLETE 31,680
   
     